High Resort Blvd Public Meeting - September 6, 2016

A public meeting was held on September 6, 2016 at 6:00 p.m. at the Loma Colorado Main Library (755 Loma Colorado Drive) in Rio Rancho to discuss the High Resort Boulevard Project. The purpose of the meeting was to present the project, existing conditions, and proposed improvements.

Items Discussed:


  • Project Location: From NM 528 to Broadmoor Boulevard.
  • Existing Conditions.
  • Proposed Improvements: new water main, addition of new recycled water line for irrigation, new storm drain features, all new curb ramps, pedestrian crossing push buttons, replacement of existing street lights, addition of flashing advanced warning beacons (Double Diamond Drive and Greenock Drive), replacement of damaged sidewalk and curb and gutter, and repairs to the pedestrian asphalt path with a 1.5 inch overlay.

Exhibits:


Adobe Disclaimer: Reading the PDF documents provided on this site requires the Adobe Acrobat Reader, available for free from Adobe. Adobe, the Adobe logo, Acrobat, and the Acrobat logo are trademarks of Adobe Systems Incorporated.