G.O. Bond Road: Sundt Road

Project Manager: Gillie Lopez
Office Phone: (505) 891-5049
E-Mail: glopez@rrnm.gov
Contract Company: HDR Engineering
Cost: $  289,680.25
Stage: Design
Schedule: June 2018 - September 2018
Sundt GO 2018
The Sundt Road Government Obligation (GO) Bond project, will include final design for reconstruction of Sundt Road from NM 528 to Tigris Road.  Improvements include new asphalt paving, curb and gutter replacement (as needed), and new Americans with Disabilities Act (ADA) compliant curb ramps.  The design will also include a new water line to replace the existing waterline along Sundt Road.

Additional Information:


Status Log:

  • November 2018: HDR is currently working on the 100% plan design.
  • July 2018: HDR is currently working on the 60% percent design.
  • June 2018:  HDR Engineering has been awarded the contract to design the Sundt Reconstruction Project.  Asphalt coring and soil samples will be collected this month.