Chessman/Idalia Drainage Improvement

Project Manager: Craig Hardy
Office Phone: (505) 259-8842
E-Mail: chardy@rrnm.gov
Contract Company: TBD
Cost: TBD
Stage: Construction
Schedule: TBD
Chessman Idalia
The project includes replacing a collapsed 30” culvert crossing Chessman Drive, miscellaneous paving, installing a drainage structure, and converting an existing drainage channel into a 60” storm sewer pipe with outfall.

Additional Information:

Status Log:

  • September 2020: Soon to be advertised for bid.