Pine Road Drainage Study

Project Manager: Craig Hardy
Office Phone: (505) 891-5048
E-Mail: chardy@rrnm.gov
Contract Company: Smith Engineering
Cost: $ 94,968.53
Stage: Preliminary Design
Schedule: March 2022 - July 2022
Pine Road at Perma Way

This project includes the drainage study of Pine Road from Perma Way to Unser Blvd. This study will seek out alternatives that will alleviate the flooding that Pine Road experiences from the arroyo across from Perma Way during rain events.

Total funding for this project comes from state funds (approximately $100,000.00).

Status Log:

  • March 2022: Working on initial design scope and field studies.